Where are Head of the Harbor and Nissequogue?
The Town of Smithtown's About Smithtown page names St. James as one of the town's hamlets and lists "three incorporated villages (Village of the Branch, Head of the Harbor & Nissequogue) within its borders."
The Village of Nissequogue's website says it was incorporated in 1926 and is "bounded on the west by the Nissequogue River, on the north by the Long Island Sound, on the east by Stony Brook Harbor," with Head of the Harbor to the south.
The Village of Head of the Harbor's website calls it "primarily residential and agricultural" and says it covers "approximately three square miles," with Stony Brook Harbor to the north and St. James to the south. The village resident handbook says Head of the Harbor was incorporated in 1928.
What does the village handle, and what does the Town of Smithtown handle?
Local government on Long Island comes in layers: towns, villages incorporated inside a town, and hamlets, which the town governs directly. Saint James is a hamlet, so the Town of Smithtown issues its building permits. In Head of the Harbor and Nissequogue, village hall does.
The Head of the Harbor building department says a permit application "is the starting point for all Board applications," including the Architectural Review Board, Planning Board, Joint Coastal Management Board and Zoning Board of Appeals. Nissequogue names the same kinds of boards, and both building departments say a permit is valid for one year and must be renewed if no certificate of occupancy has been issued.
Owners pay taxes to both governments. The Head of the Harbor handbook says village taxes are "billed annually on or about March 1st and are due by April 1st, without penalty," while Smithtown taxes go to the Receiver of Taxes at Town Hall. In Nissequogue, the village treasurer "also serves as the Receiver of Taxes for the Village."
What are the land and homes like?
Nissequogue's website says "The Village is entirely residential." The Head of the Harbor zoning map shows four residential districts and tells readers to "refer to building zone ordinance for lot area requirements."
Suffolk County's hazard mitigation plan, in annexes dated October 2020, describes each village as "zoned two acres with limited one acre parcels." The village code sets the current rules, so confirm a lot's district with the building department.
Homes range from older and historic houses to newer ones, on wooded and open lots, some on the harbor or the river. The Head of the Harbor handbook says owners must keep "a 25-foot buffer around their property," left natural and uncleared.
What permits apply on the water?
Both building departments list docks and retaining walls among the structures that need a village permit. The Joint Village Coastal Management Commission, which Nissequogue calls "a joint commission between the Village of Head-of-the-Harbor and the Village of Nissequogue," checks building applications against the Local Waterfront Revitalization Program.
New York State's Department of Environmental Conservation (DEC) says it "requires a permit for almost any activity which will alter wetlands or the adjacent areas," and that those adjacent areas "extend up to 300 feet inland from the wetland boundary." Its example: "replacing broken boards on a functional dock does not require a permit, but changing the length, width, or position of the dock does require a permit."
Head of the Harbor says an owner may need a DEC permit "or a letter of non-jurisdiction," and its handbook bars clearing trees or other flora "within one hundred feet of the ridge of the line of a barrier bluff." Nissequogue's permit packet sends work in the "DEC Scenic River Zone, Coastal Erosion Zone, Saltwater Tidal Wetlands or Freshwater Wetlands" to the DEC as well.
What should a seller in either village gather before listing?
Ask village hall for the permits and certificates of occupancy on file for the house and for any pool, deck, dock or driveway. Nissequogue posts a Freedom of Information request form, and the Head of the Harbor handbook says "FOIL forms can be obtained at Village Hall or on the village website."
Then close out open permits before a buyer's attorney asks about them. Head of the Harbor says "A Certificate of Occupancy or Compliance is required for all open permits." Its handbook also says a For Sale sign may show only a telephone number.
For repairs and the seller's disclosure, see our guides on what to fix before selling and on the property condition disclosure statement.
How does Team Rivera help sellers in these villages?
Steven and Rose of Team Rivera at Keller Williams Points North are based in Saint James, next door to both villages. Before you list, they prepare a home value report and walk the house with you, so the village permit file, any waterfront approvals and the repairs worth making are sorted out first.